Modification History
Release 1 - New unit of competency
Unit Descriptor
This unit involves the skills and knowledge required to apply an awareness of tram or light rail fundamentals.
It includes identifying tram/light rail track terminology, track and system components and the tools and equipment used on or around tram/light rail track.
Licensing or certification requirements are not applicable to this unit.
Application of the Unit
People achieving competence in this unit will need to fulfil the applicable legislated rail safety requirements including state acts and regulations together with any nationally approved compliance codes and/or guidelines.
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 Identify tram/light rail track and structures terminology and components |
1.1 Basic terminology related to tram/light rail track and structures infrastructure is identified 1.2 Main components of tram/light rail track and structures are identified |
2 Identify tram/light rail track components |
2.1 Track components and their purpose are identified and explained 2.2 Tram crossing types and components and their purpose are identified and explained 2.3 Manual, electrical and spring-operated points are identified and their use is explained |
3 Identify tram/light rail electrical system features |
3.1 Overhead trolley system components, voltages and exclusion zones are identified and explained 3.2 Below ground electrical system is identified and explained 3.3 Reporting procedures and protocols for identified electrical system faults and defects are explained |
4 Identify tram/light rail tools and equipment |
4.1 Tools and equipment for tram/light rail track installation and maintenance are identified 4.2 Track machines for tram/light rail track installation and maintenance are identified |
5 Identify tram/light rail track and system faults or problems |
5.1 Possible faults for tram/light rail track and system are identified 5.2 Reporting procedures and protocols for identified track and system faults are explained |
Required Skills and Knowledge
This section describes the knowledge and skills required for this unit. |
Required knowledge: |
|
|
|
|
|
|
|
|
|
Required skills: |
|
|
|
|
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package. |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
|
Context of and specific resources for assessment |
|
Method of assessment |
|
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. |
|
Measuring equipment may include: |
|
Tools and equipment may include: |
|
Track components may include: |
|
Track layout may include: |
|
Basic track geometry may include: |
|
Track maintenance and construction methods may include: |
|
Liaison may include: |
|
Communication equipment may include: |
|
Depending on work context, safety and personal protective equipment may include: |
|
Information/documents may include: |
|
Applicable regulations and legislation may include: |
|
Unit Sector(s)
Not applicable.
Competency Field
B – Equipment Checking and Maintenance