Modification History
Not applicable.
Unit Descriptor
This unit covers applying and monitoring the site plant and resource management plan in resources and infrastructure industries. It includes: planning, preparing for and initiating management plan activities; and monitoring, adjusting and reporting on the execution of the plan.
Application of the Unit
This unit is appropriate for those working in supervisory or technical specialist roles, within:
- Civil construction
- Coal mining
- Extractive industries
Licensing/Regulatory Information
Refer to Unit Descriptor.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan, prepare for and initiate management plan activities |
1.1. Access, interpret and apply compliance documentation relevant to site plant and resource management plan activities 1.2. Access and share with team members the geological , hydrological and survey data required to complete the management plan activities 1.3. Prepare an action plan, in consultation with involved people, which makes best use of the available resource and takes into account the requirements of the management plan and other relevant requirements and procedures 1.4. Acquire and make available the necessary resources for the safe, effective and efficient conduct of management plan activities 1.5. Issue clear and timely instructions to people involved for the safe, effective and efficient conduct in the management plan activities in accordance with relevant requirements and procedures |
2. Monitor, adjust and report on execution of the plan |
2.1. Ensure safe, effective and efficient execution of management plan activities in accordance with relevant requirements and procedures 2.2. Monitor management plan performance to ensure achievement of planned outcomes 2.3. Initiate adjustments to work programs to take into account non achievement of planned outcomes 2.4. Complete and submit reports as required by the management plan and other relevant requirements and procedures 2.5. Recommend changes to improve the safety, efficiency and effectiveness of the management plan |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to apply and monitor the site plant and resource management plan:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to apply and monitor the site plant and resource management plan:
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Relevant compliance documentation may include: |
|
Site plant and resources management plan may cover: |
|
Geological data may include relevant site specific information in relation to: |
|
Hydrological data may include: |
|
Survey data may include relevant site specific information in relation to: |
|
Resources may include: |
|
Instructions may be issued in briefings, handovers, and work orders and may include: |
|
Unit Sector(s)
Resources and Infrastructure
Competency field
Refer to Unit Sector(s).
Co-requisite units
Not applicable.