Unit of competency details

RIIMPO323A - Conduct civil construction dozer operations (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to RIIMPO323D - Conduct civil construction dozer operations 13/Nov/2013

Releases:
ReleaseRelease date
1 1 (this release) 20/May/2011

Training packages that include this unit

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
RII30809 - Certificate III in Civil Construction Plant OperationsCertificate III in Civil Construction Plant OperationsSuperseded1-3 
FPI30205 - Certificate III in Harvesting and HaulageCertificate III in Harvesting and HaulageSuperseded
FPI30211 - Certificate III in Harvesting and HaulageCertificate III in Harvesting and HaulageSuperseded1-4 
FPI30213 - Certificate III in Harvesting and HaulageCertificate III in Harvesting and HaulageSuperseded1-3 
DEF33212 - Certificate III in Military Land OperationsCertificate III in Military Land OperationsDeleted
FPI30305 - Certificate III in Sawmilling and ProcessingCertificate III in Sawmilling and ProcessingSuperseded
FPI30311 - Certificate III in Sawmilling and ProcessingCertificate III in Sawmilling and ProcessingSuperseded1-4 
FPI30405 - Certificate III in Wood Panel ProductsCertificate III in Wood Panel ProductsSuperseded
FPI30411 - Certificate III in Wood Panel ProductsCertificate III in Wood Panel ProductsSuperseded1-4 
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 9 of 9

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 030717 Plant And Machine Operations  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 030717 Plant And Machine Operations  02/Sep/2009 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

This unit covers conducting dozer operations in the civil construction industry. It includes: planning and preparing; conducting machine pre-operational checks; operating the machine; selecting, removing and fitting attachments; relocating the machine; carrying out machine operator maintenance; and cleaning up.

Application of the Unit

This unit is appropriate for those working in mobile plant operator roles, at worksites within:

  • Civil construction

Licensing/Regulatory Information

Refer to Unit Descriptor.

Pre-Requisites

Not applicable.

Employability Skills Information

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Plan and prepare

1.1. Access, interpret and apply compliance documentation  relevant to dozer operations tasks 

1.2. Obtain, confirm and apply work instructions  to the allotted task

1.3. Obtain, confirm and apply safety requirements  to the allotted task

1.4. Identify, obtain and implement signage requirements from the project traffic management plan

1.5. Select plant, tools and equipment  to carry out tasks that are consistent with the requirements of the job, check them for serviceability and rectify or report any faults

1.6. Identify, confirm and apply environmental  protection requirements from the project environmental management plan to the allotted task

2. Conduct machine pre-operational checks

2.1. Carry out pre-start, start-up, park and shutdown procedures

2.2. Check dozer controls for serviceability and functions, including implements or other attachments, brakes and manoeuvrability and rectify or report any faults

3. Operate dozer

3.1. Identify site hazards associated with dozer operations and use safe operating techniques to minimise risk

3.2. Identify and apply operating techniques for dozer to achieve optimum output in accordance with design specifications while achieving specified tolerances

3.3. Operate dozer to work instructions

4. Select, remove and fit attachments

4.1. Select attachment  for the task

4.2. Remove and fit attachment

4.3. Test attachment to ensure correct fitting and operation

4.4. Use attachment in accordance with recommendations and design limits

4.5. Remove, clean and store attachments in designated location

5. Relocate the dozer

5.1. Move dozer safely between worksites, observing relevant codes and traffic management requirements

5.2. Prepare dozer for relocation

6. Carry out machine operator maintenance

6.1. Safely park, shutdown and prepare machine for maintenance 

6.2. Conduct inspection and fault finding

6.3. Remove and replace defective parts safely and effectively

6.4. Carry our regular programmed maintenance tasks

7. Clean up

7.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan

7.2. Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

This section describes the skills and knowledge required for this unit.

Required skills 

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to conduct dozer operations:

  • apply legislative, organisation and site requirements and procedures
  • apply site and equipment safety requirements
  • apply techniques for calculating safe working loads
  • apply dozer and attachment operating techniques related to essential tasks
  • interpret drawings and sketches
  • apply operational, maintenance and basic diagnostic procedures
  • apply site isolation and traffic control responsibilities and authorities
  • interpret materials safety data sheets and apply materials handling methods
  • apply project quality requirements
  • use civil construction terminology
  • apply methods of changing machine attachments
  • apply safe operating techniques in all terrain
  • carry out basic earthworks calculations
  • apply levelling techniques
  • apply JSA's/Safe work method statement requirements

Required knowledge 

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to conduct dozer operations:

  • dozer types, characteristics, technical capabilities and limitations
  • basic principles of soil technology for civil works
  • site and equipment safety requirements
  • techniques for calculating safe working loads
  • dozer and attachment operating techniques related to essential tasks
  • processes for interpreting drawings and sketches
  • operational, maintenance and basic diagnostic procedures
  • site isolation and traffic control responsibilities and authorities
  • materials safety data sheets and materials handling methods
  • project quality requirements
  • civil construction terminology
  • methods of changing machine attachments
  • safe operating techniques in all terrain
  • basic earthworks calculations
  • civil construction activity sequences of road construction, earthworks and drainage
  • levelling techniques
  • JSA's/Safe work method statement

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

  • knowledge of the requirements, procedures and instructions for conduct dozer operations
  • implementation of requirements, procedures and techniques for the safe, effective and efficient completion of conduct dozer operations, including:
  • in a minimum of two different soil types, and
  • to include the mandatory tasks of stripping/spreading topsoil and materials, cut and fill, battering, stockpiling, bulk excavation, cutting drains, benching and backfilling
  • working with others to undertake and complete the conduct dozer operations that meet all of the required outcomes
  • consistent timely completion of conduct dozer operations that safely, effectively and efficiently meet the required outcomes
  • laser guidance or ATS are not to be used to assist in control of the machine during assessment

Context of and specific resources for assessment 

  • This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
  • The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
  • Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
  • Aboriginal people and other people from a non English speaking background may have second language issues.
  • Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
  • Where applicable, physical resources should include equipment modified for people with disabilities.
  • Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment 

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

  • written and/or oral assessment of the candidate's required knowledge
  • observed, documented and/or first hand testimonial evidence of the candidate's:
  • implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes, including:
  • in a minimum of two different soil types, and
  • to include the mandatory tasks of stripping/spreading topsoil and materials, cut and fill, battering, stockpiling, bulk excavation, cutting drains, benching and backfilling
  • consistently achieving the required outcomes
  • first hand testimonial evidence of the candidate's:
  • working with others to undertake and complete dozer operations

Guidance information for assessment 

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation 

may include:

  • legislative, organisation and site requirements and procedures
  • manufacturer's guidelines and specifications
  • Australian standards
  • codes of practice
  • Employment and workplace relations legislation
  • Equal Employment Opportunity and Disability Discrimination legislation

A dozer :

  • is a self-propelled tracked or wheeled purpose designed machine with a blade mounted at the front end
  • are to include tracked and may include wheeled

Dozer tasks  are to include:

  • stripping/spreading topsoil and materials, cut and fill, battering, stockpiling, bulk excavation, cutting drains, benching and backfilling

Dozer tasks  may include:

  • land clearing, track rolling, ripping, push loading, scrapers, towing equipment, working in tandem, winching, boxing, mixing materials and constructing fire breaks

Work instructions  may include:

  • plans, specifications, quality requirements and operational details
  • quality requirements may include but not be limited to dimensions, tolerances, standards of work and material standards as detailed in the project drawings, specifications and project documentation to meet client satisfaction

Safety requirements  are to be:

  • in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan

Safety requirements  may include:

  • protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
  • personal protective equipment is to include that prescribed under legislation, regulation and workplace policies and practices
  • safe operating procedures which are to include but not be limited to recognising and preventing hazards associated with underground and overhead services, other machines, personnel, restricted access barriers, traffic control, working at heights, working in proximity to others, worksite visitors and the public
  • safe parking practices which is to include but not be limited to ensuring access ways are clear, equipment/ machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
  • hazards and risks may include but not be limited to uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
  • emergency procedures related to this unit are to include but may not be limited to emergency shutdown and stopping, extinguishing fires, organisational First Aid requirements and evacuation

Tools and equipment  are to include:

  • hand tools and maintenance equipment relevant to the particular dozer

Environmental  requirements are to include:

  • organisational/project environmental management plan, waste management, water quality protection, noise, vibration, dust and clean-up management

Materials  may include:

  • clays, silts, stone, gravel, mud, rock, sand, topsoil, blended materials, organic materials, typical construction site materials/waste and bituminous mixes
  • rock types may include metamorphic, igneous and sedimentary

Attachments  may include:

  • but not be limited to stick rakes, root rakes, push blade, angle blade, bull blade, power angle tilt blade, rippers, winch, tree pusher, cable plough, stump plough, power control unit and cable drum

Operator maintenance  is to include:

  • cleaning, authorised servicing and the monitoring, recording and reporting of faults. It may also include the conduct of authorised minor replacements and the provision of assistance to maintenance personnel during maintenance and repair activities

Unit Sector(s)

Mobile Plant Operations

Competency field

Refer to Unit Sector(s).