^

 
 

Unit of competency details

RIICTB309A - Construct, maintain and remove coffer dams (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to RIICTB309D - Construct, maintain and remove coffer dams 13/Nov/2013

Releases:
ReleaseRelease date
1 1 (this release) 22/Jun/2011

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 030901 Construction Engineering  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 030901 Construction Engineering  02/Sep/2009 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

This unit covers the construction, maintenance and removal of coffer dams in the civil construction industry. It includes planning and preparing, constructing and maintaining a dam, removing a coffer dam, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.

Application of the Unit

This unit is appropriate for those working in an operational role at worksites within:

  • Civil construction

Licensing/Regulatory Information

Refer to Unit Descriptor.

Pre-Requisites

Not applicable.

Employability Skills Information

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Plan and prepare

1.1. Access, interpret and apply compliance documentation  relevant to the work activity

1.2. Obtain and confirm safety requirements  from the site  safety plan and organisational policies and procedures, and apply to the allotted task

1.3. Identify, obtain and implement signage  requirements from the project traffic  management plan

1.4. Select plant, tools and equipment  to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults

1.5. Identify materials  appropriate to the work application, and ensure they are safely handled and located ready for use

1.6. Identify environmental protection requirements  from the project environmental management plan

2. Construct and maintain a dam

2.1. Contact utilities to check placement of marine cables before coffer dam construction 

2.2. Drive sheet piles into location in accordance with specifications

2.3. Brace  sheet piles

2.4. Dewater  and caulk  dammed area

2.5. Install sump and/or pump to remove excess water seepage

2.6. Remove mud manually from dammed area

2.7. Level dammed area  ready for bridge work to commence

3. Remove coffer dam

3.1. Clear dammed area of any refuse or construction waste

3.2. Remove temporary concrete slab, where used

3.3. Flood coffer dam

3.4. Remove sheet pile

3.5. Extract and dismantle sheet piling allowing waterway to restore its original flow

4. Clean up

4.1. Clear work area and dispose of or recycle materials in accordance with state or territory legislation

4.2. Clean, check, maintain and store machinery, tools and equipment

Required Skills and Knowledge

This section describes the skills and knowledge required for this unit.

Required skills 

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to construct, maintain and remove coffer dams:

  • apply legislative, organisation and site requirements and procedures for construction, maintenance and removal of coffer dams
  • organise work activities
  • select and use relevant tools and equipment safely
  • identify and report on hazards related to the worksite and work activity
  • communicate effectively to receive and clarify work instructions

Required knowledge 

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to construct, maintain and remove coffer dams:

  • site and equipment safety requirements
  • boat and water safety
  • sheet piling
  • environmental protection act
  • dewatering
  • caulking
  • dial before you dig
  • bridge foundations
  • bridge heritage
  • equipment types, characteristics, technical capabilities and limitations
  • processes for the calculation of material requirements
  • operational, maintenance and basic diagnostic procedures
  • site isolation and traffic control responsibilities and authorities
  • materials safety data sheets and materials handling methods
  • quality assurance systems and standards
  • JSAs/safe work method statements

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

  • knowledge of the requirements, procedures and instructions for construction, maintenance and removal of coffer dams
  • implementation of requirements, procedures and techniques for the safe, effective and efficient completion of construction, maintenance and removal of coffer dams
  • working with others to undertake and complete the construction, maintenance and removal of coffer dams that meets all of the required outcomes
  • consistent timely completion of the construction, maintenance and removal of coffer dams that safely, effectively and efficiently meets the required outcomes
  • construction, maintenance and removal of at least one coffer dam, with at least four sheet piles, large enough to require bracing

Context of and specific resources for assessment 

  • This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
  • Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
  • The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
  • Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
  • Aboriginal people and other people from a non English speaking background may have second language issues.
  • Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment 

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

  • written and/or oral assessment of the candidate's required knowledge
  • observed, documented and/or first hand testimonial evidence of the candidate's:
  • implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
  • consistent achievement of required outcomes
  • first hand testimonial evidence of the candidate's:
  • working with others to undertake and complete the construction, maintenance and removal of coffer dams

Guidance information for assessment 

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation  may include:

  • legislative, organisational and site requirements and procedures
  • manufacturer's guidelines and specifications
  • Australian standards
  • Employment and workplace relations legislation
  • Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements  may include:

  • OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
  • safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
  • safe operating procedures including recognising and preventing hazards associated with uneven/unstable terrain, trees, pits, poles, trip hazards, dirt mounds, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working in proximity to others, worksite visitors and the public
  • recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
  • emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Site  locations may include:

  • any water or ground conditions in urban and rural areas where damming is to occur for the purposes of bridge construction or repair

Signage  may include:

  • boat navigation devices (including night navigation)
  • site safety signage
  • temporary signage for the benefit of boat operators and other waterway users

Traffic  conditions may include:

  • rivers
  • streams
  • trafficked waterways

Tools and equipment  may include:

  • sheet piling
  • boats
  • pneumatic hammers
  • pile drivers
  • sheet lifters
  • excavators/backhoes
  • shovels
  • sludge pumps
  • bracing
  • slings
  • chains
  • shackles
  • crane

Materials  may include:

  • caulking material
  • concrete

Environmental protection requirements  may include:

  • waste management
  • stormwater protection
  • noise
  • dust
  • vibration
  • safe use of preservatives
  • waterway protection
  • clean-up management

Coffer dam construction  may include:

  • sheet pile construction
  • sandbags, timber or proprietary systems
  • construction conducted in conjunction with plant operators and doggers

Brace  may include:

  • pipes
  • timber
  • jacks
  • adjustable props

Dewater  refers to:

  • the process of removing water and sludge from the sheeted off or dammed area using pumps and sumps (a pit excavated at the lowest point to collect excess water seepage)

Caulk  may include:

  • caulking of sheet piling joints using sealants including:
  • bitumen
  • concrete expansion strips
  • impregnated fibre board
  • rubber strips

Level dammed area  may include:

  • laying of a temporary concrete slab

Unit Sector(s)

Timber Bridge Construction and Maintenance

Competency field

Refer to Unit Sector(s).

Co-requisite units

Not applicable.