Unit Descriptor
This unit covers the conduct of concrete placing and compacting operations in the civil construction industry. It includes planning, preparing, defining the work area, placing, compacting, screeding, levelling and clean up during concreting operations. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Application of the Unit
This unit is appropriate for those working in an operational role at worksites within:
Civil construction
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1. Plan and prepare for operations |
1.1 Access, interpret and apply compliance documentation relevant to the work activity 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 1.3 Identify, obtain and implement signage requirements from the project traffic management plan 1.4 Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task |
2. Define and prepare work area |
2.1 Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste 2.2 Maintain safe working area around pour location using barriers and signage consistent with OHS regulations 2.3 Locate plant, tools and equipment to suit planned placement 2.4 Undertake pre-pour inspections before concrete arrives on site |
3. Place concrete and compact |
3.1 Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines 3.2 Minimise height of vertical drop of concrete to avoid segregation of concrete materials 3.3 Consolidate poured concrete during process using approved compaction or vibration method 3.4 Check finished levels against datum using levelling device |
4. Screed/level concrete |
4.1 Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed |
5. Clean up |
5.1 Clear work area and dispose, reuse or recycle materials in accordance with legislation, regulations, codes of practice and job specification 5.2 Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices |
Required Skills and Knowledge
Required skills |
Specific skill is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct placement and compaction of concrete including:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct placement and compacting concrete including:
|
Evidence Guide
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Information includes: |
|
Planning and preparation include: |
|
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include: |
|
Tools and equipment : |
|
Quality requirements include: |
|
Materials include: |
|
Environmental requirements include: |
|
Concrete delivery includes: |
|
Placing of concrete includes: |
|
Methods to avoid segregation of concrete include: |
|
Compaction or vibration methods include: |
|
Finishing techniques include: |
|
Screed : |
|