This unit covers the installation of pre-cast concrete bridge decks in the civil construction industry. It includes planning and preparing, installing bearings, installing concrete bridge decks, fixing bridge fittings, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Application of the Unit
This unit is appropriate for those working in an operational role at worksites within:
- Civil construction
Licensing/Regulatory Information
Refer to Unit Descriptor.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare |
1.1. Access, interpret and apply compliance documentation relevant to the work activity 1.2. Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task 1.3. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 1.4. Identify, obtain and implement signage requirements from the project traffic management plan 1.5. Select plant , tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 1.6. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task |
2. Install bearings |
2.1. Determine bearing types and position from project drawings and specifications 2.2. Check bearing dimensions and material for quality against specifications 2.3. Install bearings as required by project drawings 2.4. Identify locating brackets/bolts and install in preparation for placement of girders as required |
3. Install concrete bridge deck |
3.1. Prepare deck components for grouting prior to placement in accordance with deck design and specifications 3.2. Place deck components 3.3. Carry out and complete pre-fabricated concrete decking grouting 3.4. Insert and tension pre-fabricated concrete decking transverse stressing bar as specified 3.5. Grout transverse stressing bar to specifications 3.6. Grout anchor bolts 3.7. Place and specify deck joints of pre-fabricated decking and scuppers |
4. Fix bridge fittings |
4.1. Fit posts and bridge rails as per project drawings and specifications 4.2. Assemble pre-fabricated stairs and install to specifications where required |
5. Clean up |
5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan 5.2. Clean, check, maintain and store plant, tools and equipment |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to install pre-cast concrete bridge decks:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to install pre-cast concrete bridge decks:
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Relevant compliance documentation may include: |
|
Safety requirements may include: |
|
Site may include: |
|
Signage requirements may include: |
|
Traffic may include: |
|
Plant , tools and equipment may include: |
|
Environmental protection requirements may include: |
|
Bearing types may include: |
|
Deck may include: |
|
Materials may include: |
|
Unit Sector(s)
Construction and Maintenance (General)
Competency field
Refer to Unit Sector(s).