Modification History
Release |
Comments |
1 |
Replaces RII50409 Diploma of Civil Construction Management. |
2 |
Packaging rules amended to establish specific requirements for civil construction and civil works. |
3 |
Updated pre-requisite information for imported units. |
4 |
Corrected modification history. |
Qualification Description
This qualification reflects the role of personnel working on a single or a group of Civil Construction sites, who perform tasks involving a high level of autonomy and require the application of significant judgement in planning and determining the selection of equipment/roles/techniques for themselves and others. They are required to develop site specific work instructions and practices to ensure the implementation of the site management systems, plans and policies. They demonstrate the application of a broad range of technical, managerial, coordination and planning skills.
No licensing, legislative or certification requirements apply to this qualification at the time of publication.
Entry Requirements
There are no entry requirements for this qualification.
Packaging Rules
Requirements for the completion of the qualification
The following provides the packaging rules for this qualification, followed by the list of relevant units of competency.
Successful completion of thirteen (13) units made up of:
- five (5) core units, and
- eight (8) elective units of which:
- at least one (1) must be chosen from group A
- at least four (4) must come from group B
- up to two (2) may come from Certificate IV, Diploma or Advanced Diploma level from this or any other Training Package or accredited course
Units chosen must be relevant to the job function.
There are prerequisites to imported units listed in this qualification. Where a unit is imported as an elective care must be taken to ensure that all prerequisites specified are complied with.
Core units of competency |
|
Unit code |
Unit title |
BSBWHS501A |
Ensure a safe workplace |
BSBWOR502B |
Ensure team effectiveness |
RIIENV501D |
Implement and maintain environmental management plan |
RIIQUA501D |
Implement, monitor and develop quality management plans |
RIIRIS501D |
Implement and maintain management systems to control risk |
Electives |
|
Group A |
|
Unit code |
Unit title |
RIICWM501D |
Implement civil construction plan |
RIICWM502D |
Implement civil works maintenance program |
Group B |
|
Unit code |
Unit title |
BSBCUS501A |
Manage quality customer service |
BSBFIM501A |
Manage budgets and financial plans |
BSBHRM506A |
Manage recruitment selection and induction processes |
BSBINM501A |
Manage an information or knowledge management system |
BSBINN502A |
Build and sustain an innovative work environment |
BSBLED501A |
Develop a workplace learning environment |
BSBMGT515A |
Manage operational plan |
BSBMGT516C |
Facilitate continuous improvement |
BSBPMG521A |
Manage project integration |
BSBPMG511A |
Manage project scope |
BSBPMG512A |
Manage project time |
BSBPMG514A |
Manage project cost |
BSBPMG513A |
Manage project quality |
BSBPMG515A |
Manage project human resources |
BSBPMG516A |
Manage project information and communication |
BSBPMG517A |
Manage project risk |
BSBPMG518A |
Manage project procurement |
BSBWOR501B |
Manage personal work priorities and professional development |
BSBWRK510A |
Manage employee relations |
LGACOM401A |
Administer contracts |
LGAWORK501A |
Prepare preliminary design for operational works |
LGAWORK502A |
Prepare detailed works project documentation |
LGAWORK503A |
Undertake project investigation |
MSL925001A |
Analyse data and report results
|
MSL975007A |
Supervise earthworks inspection, sampling and testing operations
|
MSL975016A |
Perform complex tests to measure engineering properties of materials
|
RIIBHD501D |
Manage blast hole drilling operations |
RIIBLA401D |
Manage blasting operations |
RIIBLA601D |
Design surface blasts |
RIICWD503D |
Prepare work zone traffic management plan |
RIICWM503D |
Prepare civil works cost estimate |
RIICWM504D |
Prepare civil works bill of quantities |
RIICWM505D |
Prepare civil works schedule of rates |
RIIRAI502D |
Implement site plant and resource management plan |
RIIRIS403D |
Managing and coordinating spill response |
RIISAM501D |
Implement and maintain the site plant, equipment and infrastructure maintenance plan |
Qualification Mapping Information
No equivalent qualification
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272