Modification History
Release |
Comments |
1 |
Replaces RII30912 Certificate III in Civil Construction. Packaging rules amended to comply with Standards for Training Packages. |
2 |
Superseded imported units updated. |
3 |
Editorial corrections; superseded imported units updated. Corrected modification history. |
Qualification Description
This qualification reflects the role of a skilled operator working in civil construction, who applies a broad range of skills in a varied work context, using some discretion and judgement and relevant theoretical knowledge.
The qualification applies to specialist occupations in Bituminous Surfacing Bridge Construction and Maintenance, Pipe Laying, Road Construction and Maintenance, Road Marking, Tunnel Construction, Timber Bridge Construction and Maintenance and Civil Construction general occupations. The individual may provide theoretical advice and support a team.
Licensing, legislative, regulatory and certification requirements that apply to this qualification can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the qualification.
Entry Requirements
There are no entry requirements for this qualification.
Packaging Rules
Requirements for completion of the qualification
The following provides the packaging rules for this qualification, followed by the list of relevant units of competency.
The qualification has core and elective units of competency requirements that cover the general and specialist skills for seven (7) specialist and one (1) general civil construction stream.
Stream 1 – Bituminous Surfacing
Stream 2 – Bridge Construction and Maintenance
Stream 3 – Pipe Laying
Stream 4 – Road Construction and Maintenance
Stream 5 – Road Marking
Stream 6 – Tunnel Construction
Stream 7 – Timber Bridge Construction and Maintenance
Stream 8 – Civil Construction General
The core units and requirements of one (1) stream must be met for award of this qualification.
Units chosen must be relevant to the job function.
There are both licensed and non-licensed units of competency relating to high risk work in the Resources and Infrastructure Industry Training Package. To be appointed under any statutory requirements in related roles, units of competency should be selected to meet the state/territory licensing requirements.
There are no prerequisites to imported units listed in this qualification.
Stream 1 – Bituminous Surfacing
Successful completion of twenty five (25) units of competency made up of:
- seven (7) core units, and
- eighteen (18) elective units of which:
- seven (7) must be chosen from group A
- at least six (6) must be chosen from group B including:
- at least three (3) must be chosen from Certificate III level bituminous surfacing units (RIICBS),
OR
- at least two (2) must be chosen from Certificate III level bituminous surfacing units and one (1) at Certificate IV level bituminous surfacing unit
- up to five (5) may be chosen from Certificate II, Certificate III or Certificate IV level from this, or any other Training Package or accredited course
Stream 2 – Bridge Construction and Maintenance
Successful completion of twenty five (25) units of competency made up of:
seven (7) core units, and
eighteen (18) elective units of which:
- eight (8) must be chosen from group C
- at least five (5) must be chosen from group D and/or group Q
- including at least two (2) Certificate III level bridge maintenance (RIICBM) units
- up to five (5) may be chosen from Certificate II, Certificate III or Certificate IV level from this, or any other Training Package or accredited course
Stream 3 – Pipe Laying
Successful completion of twenty five (25) units of competency with at least four (4) of electives chosen must be at Certificate III level made up of:
seven (7) core units, and
eighteen (18) elective units of which:
- ten (10) must be chosen from group E
- at least three (3) must be chosen from group F and/or Group Q
- at least one (1) must be chosen from Group G
- up to four (4) may be chosen from Certificate II, Certificate III or Certificate IV level from this, or any other Training Package or accredited course
Stream 4 – Road Construction and Maintenance
Successful completion of twenty five (25) units of competency with at least four (4) of electives chosen must be at Certificate III level made up of:
- seven (7) core units, and
- eighteen (18) elective units of which:
- nine (9) must be chosen from group H
- at least four (4) must be chosen from group I and/or group Q, including:
- at least four (4) road construction and maintenance (RIICRC) units, of which at least two (2) at Certificate III level
- up to five (5) may come from Certificate II, Certificate III or Certificate IV from this, or any other Training Package or accredited course
Stream 5 – Road Marking
Successful completion of twenty two (22) units of competency made up of:
- seven (7) core units, and
- fifteen (15) elective units of which:
- four (4) must be chosen from group J
- at least seven (7) must be chosen from group K and/or group Q, including:
- at least five (5) road marking (RIICRM) units, of which at least one (1) unit at Certificate III level
- up to four (4) may come from Certificate II, Certificate III or Certificate IV from this, or any other Training Package or accredited course
Stream 6 – Tunnel Construction
Successful completion of twenty five (25) units of competency made up of:
- seven (7) core units, and
- eighteen (18) elective units of which:
- eight (8) must be chosen from group L
- at least five (5) must be chosen from group M and/or group Q, including:
- at least three (3) at Certificate III level, of which at least two (2) must be tunnel construction (RIICTC) units
- up to five (5) may come from Certificate II, Certificate III or Certificate IV from this, or any other Training Package or accredited course
Stream 7 – Timber Bridge Construction and Maintenance
Successful completion of twenty eight (28) units of competency made up of:
- seven (7) core units, and
- twenty-one (21) elective units of which:
- twelve (12) must be chosen from group N
- at least four (4) must be chosen from Group O and/or Group Q, of which at least two (2) must be at Certificate III level
- up to five (5) may be chosen from Certificate II, Certificate III or Certificate IV from this, or any other Training Package or accredited course
Stream 8 – Civil Construction General
Successful completion of twenty five (25) units of competency made up of:
- seven (7) core units, and
- eighteen (18) elective units of which:
- at least thirteen (13) must be chosen from group P and/or group Q, of which at least ten (10) at Certificate III level
- up to five (5) may be chosen from Certificate II, III or IV from this, or any other Training Package and accredited course
Core units of competency |
|
Unit code |
Unit title |
RIIBEF201D |
Plan and organise work |
RIICCM201D |
Carry out measurements and calculations |
RIICCM203D |
Read and interpret plans and specifications |
RIICOM201D |
Communicate in the workplace |
RIIWHS201D |
Work safely and follow WHS policies and procedures |
RIISAM203D |
Use hand and power tools |
RIISAM204D |
Operate small plant and equipment |
Electives |
|
Group A |
|
Unit code |
Unit title |
RIICBS202D |
Hand spread asphalt |
RIICBS203D |
Safely handle bituminous materials |
RIICBS207D |
Take samples of materials used in road surfacing |
RIICCM207D |
Spread and compact materials manually |
RIIWHS302D |
Implement traffic management plan |
RIIIMG301D |
Maintain site records |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
Group B |
|
Unit code |
Unit title |
BSBCUS301B |
Deliver and monitor a service to customers |
BSBFLM305C |
Support operational plan |
BSBFLM312B |
Contribute to team effectiveness |
RIICBS201D |
Conduct tack coat spraying operations |
RIICBS204D |
Conduct aggregate spreader box operations |
RIICBS205D |
Roll aggregate in sprayed sealing operations |
RIICBS206D |
Conduct pavement sweeping operations |
RIICBS208D |
Conduct road maintenance operations |
RIICBS301D |
Conduct profile planer operations |
RIICBS302D |
Conduct paver screeding operations |
RIICBS303D |
Conduct materials transfer vehicle operations |
RIICBS304D |
Compact asphalt with rollers |
RIICBS305D |
Conduct asphalt paver operations |
RIICBS306D |
Conduct slurry sealing operations |
RIICBS307D |
Conduct bitumen sprayer operations |
RIICBS308D |
Load aggregate using a purpose built loader |
RIICBS309D |
Conduct self-propelled aggregate spreader operations |
RIICBS310D |
Conduct patching operations |
RIICBS311D |
Produce asphalt products |
RIICBS312D |
Conduct bitumen tanker operations |
RIICBS402D |
Apply the principles for the application of bituminous sprayed treatment |
RIICCM205D |
Carry out manual excavation |
RIICBS303D |
Conduct materials transfer vehicle operations |
RIICBS304D |
Compact asphalt with rollers |
RIICBS305D |
Conduct asphalt paver operations |
RIICBS306D |
Conduct slurry sealing operations |
RIICBS307D |
Conduct bitumen sprayer operations |
RIICBS308D |
Load aggregate using a purpose built loader |
RIICBS309D |
Conduct self-propelled aggregate spreader operations |
RIICBS310D |
Conduct patching operations |
RIICBS311D |
Produce asphalt products |
RIIRIS202D |
Respond to site based spills |
RIIVEH304D |
Conduct tip truck operations |
Group C |
|
Unit code |
Unit title |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIIWHS302D |
Implement traffic management plan |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
RIIWMG203D |
Drain and dewater civil construction site |
Group D |
|
Unit code |
Unit title |
CPCCCM2007B |
Use explosive power tools |
CPCCSF2004A |
Place and fix reinforcement materials |
RIICBM201D |
Strip pile heads |
RIICBM301D |
Maintain concrete bridges |
RIICBM302D |
Install pre-cast girders |
RIICBM303D |
Install pre-cast parapets |
RIICBM304D |
Operate a bridge inspection unit |
RIICBM305D |
Install pre-cast concrete bridge decks |
RIICBM306D |
Undertake concreting work on concrete bridges |
RIICBM307D |
Construct formwork and false work on concrete bridges |
RIICCM209D |
Carry out concrete work |
RIICCM210D |
Install trench support |
RIICCM211D |
Erect and dismantle temporary fencing and gates |
RIICCM301D |
Construct and dismantle fences and gates |
RIICRC201D |
Repair potholes |
RIICRC208D |
Lay pipes |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN301D |
Operate elevating work platform |
RIIHAN302D |
Conduct intermediate scaffolding operations |
RIIIMG301D |
Maintain site records |
RIIWHS202D |
Enter and work in confined spaces |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIWMG301D |
Control construction site water table |
Group E |
|
Unit code |
Unit title |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIIWHS302D |
Implement traffic management plan |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
RIIWMG203D |
Drain and dewater civil construction site |
RIICCM210D |
Install trench support |
RIICRC208D |
Lay pipes |
Group F |
|
Unit code |
Unit title |
CPCCM2007B |
Use explosive power tools |
RIICCM209D |
Carry out concrete work |
RIICCM211D |
Erect and dismantle temporary fencing and gates |
RIICCM301D |
Construct and dismantle fences and gates |
RIICPL304D |
Install pre-cast gully pits |
RIICPL305D |
Install pre-case access chambers |
RIICRC201D |
Repair potholes |
RIICRC203D |
Install sub-soil drainage |
RIICRC209D |
Lay reinforced concrete box culverts |
RIICRC301D |
Maintain drainage systems |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN301D |
Operate elevating work platform |
RIIIMG301D |
Maintain site records |
RIIMPO327D |
Conduct pipe layer operations |
RIIWHS202D |
Enter and work in confined spaces |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIWMG301D |
Control construction site water table |
UEGNSG202B |
Construct and lay distribution pipelines |
Group G |
|
Unit code |
Unit title |
RIICPL301D |
Install water mains pipelines |
RIICPL302D |
Install storm water systems |
RIICPL303D |
Install sewer pipelines |
Group H |
|
Unit code |
Unit title |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIICRC201D |
Repair potholes |
RIIWHS302D |
Implement traffic management plan |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
RIIWMG203D |
Drain and dewater civil construction site |
Group I |
|
Unit code |
Unit title |
CPCCCM2007B |
Use explosive power tools |
CPCCSF2004A |
Place and fix reinforcement materials |
FPICOT2239A |
Trim and cut felled trees |
FPIFGM3212 |
Fall trees manually (intermediate) |
RIICBS202D |
Hand spread asphalt |
RIICBS203D |
Safely handle bituminous materials |
RIICBS301D |
Conduct profile planer operations |
RIICCM209D |
Carry out concrete work |
RIICCM210D |
Install trench support |
RIICCM211D |
Erect and dismantle temporary fencing and gates |
RIICCM301D |
Construct and dismantle fences and gates |
RIICPL302D |
Install storm water systems |
RIICPL304D |
Install pre-cast gully pits |
RIICPL305D |
Install pre-cast access chambers |
RIICRC202D |
Install signs |
RIICRC203D |
Install sub-soil drainage |
RIICRC204D |
Install and maintain roadside fixtures |
RIICRC205D |
Install utility poles |
RIICRC206D |
Install pre-cast concrete crash barriers |
RIICRC207D |
Install noise barriers |
RIICRC208D |
Lay pipes |
RIICRC209D |
Lay reinforced concrete box culverts |
RIICRC301D |
Maintain drainage systems |
RIICRC302D |
Place and form concrete kerb, channel and fixtures |
RIICRC303D |
Lay pavers |
RIICRC304D |
Maintain sealed roads |
RIICRC305D |
Conduct road construction paver screeding operations |
RIICRC306D |
Conduct earthworks |
RIICRC307D |
Conduct road pavement construction |
RIICRC309D |
Conduct stabiliser operations |
RIICRC311D |
Conduct concrete road paver operations |
RIICRC312D |
Setup and maintain concrete paver stringlines |
RIICRC313D |
Conduct concrete road curing and texturing operations |
RIICRC314D |
Handle concrete materials |
RIICRC315D |
Use concreting materials and equipment |
RIICRC316D |
Place and compact concrete |
RIICRC317D |
Finish concrete pavements |
RIICRC318D |
Cure concrete |
RIICRC319D |
Saw and cut concrete pavements to initiate planned cracks |
RIICRC320D |
Seal concrete pavements |
RIICRC321D |
Use automated paving guidance systems |
RIICRC322D |
Receive, check and record concrete deliveries |
RIICRC323D |
Insert tie bars in fresh concrete |
RIIHAN201D |
Operate a forklift |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN301D |
Operate elevating work platform |
RIIHAN307D |
Operate a vehicle loading crane |
RIIIMG301D |
Maintain site records |
RIIWHS202D |
Enter and work in confined spaces |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIWMG301D |
Control construction site water table |
TLID3011A |
Conduct specialised forklift operations |
Group J |
|
Unt code |
Unit title |
RIICRM202D |
Handle and store road marking materials |
RIICRM204D |
Prepare surface for road marking |
RIIWHS302D |
Implement traffic management plan |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
Group K |
|
Unit code |
Unit title |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM208D |
Carry out basic levelling |
RIICCM209D |
Carry out concrete work |
RIICRC202D |
Install signs |
RIICRM201D |
Escort mobile road marking operations |
RIICRM203D |
Conduct pedestrian road marking operations |
RIICRM205D |
Conduct road marking measuring operations |
RIICRM206D |
Conduct airless and atomised spraying operations |
RIICRM207D |
Install raised pavement markers |
RIICRM301D |
Conduct ride on road marking operations |
RIICRM302D |
Conduct long line road marking operations |
RIICRM303D |
Conduct thermo plastic road marking operations |
RIIHAN201D |
Operate a forklift |
RIIHAN208D |
Perform dogging |
RIIHAN301D |
Operate elevating work platform |
RIIHAN307D |
Operate a vehicle loading crane |
RIIIMG301D |
Maintain site records |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
Group L |
|
Unit code |
Unit title |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIICRC203D |
Install sub-soil drainage |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of non toxic materials |
RIIWMG203D |
Drain and dewater civil construction site |
Group M |
|
Unit code |
Unit title |
CPCCCM2007B |
Use explosive power tools |
RIIBLA202D |
Support underground shotfiring operations |
RIIBLA205D |
Store, handle and transport explosives |
RIIBLA303D |
Conduct underground development shotfiring |
RIICCM209D |
Carry out concrete work |
RIICCM210D |
Install trench support |
RIICCM211D |
Erect and dismantle temporary fencing and gates |
RIICCM301D |
Construct and dismantle fences and gates |
RIICFW302D |
Install temporary and permanent rock anchors |
RIICFW303D |
Install primary ground support |
RIICRC201D |
Repair potholes |
RIICRC208D |
Lay pipes |
RIICRC301D |
Maintain drainage systems |
RIICTC301D |
Install tunnelling constructions services |
RIICTC302D |
Line tunnel |
RIICTC303D |
Excavate tunnel by machine |
RIICTC304D |
Muck out tunnel earthworks |
RIICTC305D |
Construct portals |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN301D |
Operate elevating work platform |
RIIWHS202D |
Enter and work in confined spaces |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIWHS302D |
Implement traffic management plan |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIUND310D |
Apply shot-crete |
Group N |
|
Unit code |
Unit title |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM210D |
Install trench support |
RIICTB201D |
Maintain timber bridges |
RIICTB301D |
Undertake visual inspection |
RIICTB302D |
Install temporary support members |
RIICTB304D |
Install or replace sub-structure members |
RIICTB305D |
Install or replace super-structure members |
RIICTB306D |
Splice and connect timber members |
RIIWHS202D |
Enter and work in confined spaces |
RIISAM201D |
Handle resources and infrastructure materials and safely dispose of nontoxic materials |
Group O |
|
Unit code |
Unit title |
FPICOT2239A |
Trim and cut felled trees |
RIICBM304D |
Operate a bridge inspection unit |
RIICBM307D |
Construct formwork and false work on concrete bridges |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIICCM209D |
Carry out concrete work |
RIICCM301D |
Construct and dismantle fences and gates |
RIICFW304D |
Conduct pile driving operations |
RIICFW306D |
Direct pile driving operations |
RIICTB202D |
Apply bridge durability treatment |
RIICTB203D |
Produce drawings and sketches |
RIICTB303D |
Erect a temporary modular support system (bailey) on an existing bridge |
RIICTB307D |
Assemble a temporary modular bridge |
RIICTB308D |
Install or replace truss members |
RIICTB309D |
Construct, maintain and remove coffer dams |
RIICTB310D |
Construct specialised timber deck systems |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN302D |
Conduct intermediate scaffolding operations |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIWHS302D |
Implement traffic management plan |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIWMG203D |
Drain and dewater civil construction site |
Group P |
|
Unit code |
Unit title |
CPCCCM2007B |
Use explosive power tools |
CPCCSF2004A |
Place and fix reinforcement materials |
BSBCUS301B |
Deliver and monitor a service to customers |
BSBFLM312B |
Contribute to team effectiveness |
BSBFLM305C |
Support operational plan |
FPICOT2239A |
Trim and cut felled trees |
FPIFGM3212 |
Fall trees manually (intermediate) |
RIIBLA201D |
Support shotfiring operations |
RIIBLA202D |
Support underground shotfiring operations |
RIIBLA205D |
Store, handle and transport explosives |
RIIBLA301D |
Conduct surface shotfiring operations |
RIIBLA303D |
Conduct underground development shotfiring |
RIICBM201D |
Strip pile heads |
RIICBM301D |
Maintain concrete bridges |
RIICBM302D |
Install pre-cast girders |
RIICBM303D |
Install pre-cast parapets |
RIICBM304D |
Operate a bridge inspection unit |
RIICBM305D |
Install pre-cast concrete bridge decks |
RIICBM306D |
Undertake concreting work on concrete bridges |
RIICBM307D |
Construct formwork and false work on concrete bridges |
RIICBS201D |
Conduct tack coat spraying operations |
RIICBS202D |
Hand spread asphalt |
RIICBS203D |
Safely handle bituminous materials |
RIICBS204D |
Conduct aggregate spreader box operations |
RIICBS205D |
Roll aggregate in sprayed sealing operations |
RIICBS206D |
Conduct pavement sweeping operations |
RIICBS207D |
Take samples of materials used in road surfacing |
RIICBS208D |
Conduct road maintenance operations |
RIICBS301D |
Conduct profile planer operations |
RIICBS302D |
Conduct paver screeding operations |
RIICBS303D |
Conduct materials transfer vehicle operations |
RIICBS304D |
Compact asphalt with rollers |
RIICBS305D |
Conduct asphalt paver operations |
RIICBS306D |
Conduct slurry sealing operations |
RIICBS307D |
Conduct bitumen sprayer operations |
RIICBS308D |
Load aggregate using a purpose built loader |
RIICBS309D |
Conduct self-propelled aggregate spreader operations |
RIICBS310D |
Conduct patching operations |
RIICBS311D |
Produce asphalt products |
RIICBS312D |
Conduct bitumen tanker operations |
RIICCM202D |
Identify, locate and protect underground services |
RIICCM205D |
Carry out manual excavation |
RIICCM206D |
Support plant operations |
RIICCM207D |
Spread and compact materials manually |
RIICCM208D |
Carry out basic levelling |
RIICCM209D |
Carry out concrete work |
RIICCM210D |
Install trench support |
RIICCM211D |
Erect and dismantle temporary fencing and gates |
RIICCM301D |
Construct and dismantle fences and gates |
RIICFW301D |
Construct underpinning |
RIICBS303D |
Conduct materials transfer vehicle operations |
RIICBS304D |
Compact asphalt with rollers |
RIICBS305D |
Conduct asphalt paver operations |
RIICBS306D |
Conduct slurry sealing operations |
RIICFW302D |
Install temporary and permanent rock anchors |
RIICFW303D |
Install primary ground support |
RIICFW304D |
Conduct pile driving operations |
RIICFW305D |
Conduct cast in-situ pilings operations |
RIICFW306D |
Direct pile driving operations |
RIICFW307D |
Direct cast in-situ piling operations |
RIICPL301D |
Install water mains pipelines |
RIICPL302D |
Install storm water systems |
RIICPL303D |
Install sewer pipelines |
RIICPL304D |
Install pre-cast gully pits |
RIICPL305D |
Install pre-cast access chambers |
RIICRC201D |
Repair potholes |
RIICRC202D |
Install signs |
RIICRC203D |
Install sub-soil drainage |
RIICRC204D |
Install and maintain roadside fixtures |
RIICRC205D |
Install utility poles |
RIICRC206D |
Install pre-cast concrete crash barriers |
RIICRC207D |
Install noise barriers |
RIICRC208D |
Lay pipes |
RIICRC209D |
Lay reinforced concrete box culverts |
RIICRC301D |
Maintain drainage systems |
RIICRC302D |
Place and form concrete kerb, channel and fixtures |
RIICRC303D |
Lay pavers |
RIICRC304D |
Maintain sealed roads |
RIICRC305D |
Conduct road construction paver screeding operations |
RIICRC306D |
Conduct earthworks |
RIICRC307D |
Conduct road pavement construction |
RIICRM201D |
Escort mobile road marking operations |
RIICRM202D |
Handle and store road marking materials |
RIICRM203D |
Conduct pedestrian road marking operations |
RIICRM204D |
Prepare surface for road marking |
RIICRM205D |
Conduct road marking measuring operations |
RIICRM206D |
Conduct airless and atomised spraying operations |
RIICRM207D |
Install raised pavement markers |
RIICRM301D |
Conduct ride on road marking operations |
RIICRM302D |
Conduct long line road marking operations |
RIICRM303D |
Conduct thermo plastic road marking operations |
RIICTC301D |
Install tunnelling constructions services |
RIICTC302D |
Line tunnel |
RIICTC303D |
Excavate tunnel by machine |
RIICTC304D |
Muck out tunnel earthworks |
RIICTC305D |
Construct portals |
RIICTT301D |
Conduct fluid assisted directional boring |
RIICTT302D |
Conduct impact moling, ramming and augering |
RIICTT303D |
Control micro tunnelling and pipe jacking |
RIICTT304D |
Undertake on-line replacement for existing pipeline systems |
RIICTT305D |
Undertake localised repair and sealing of existing pipeline systems |
RIICTT306D |
Install cure in-place linings for existing pipeline systems |
RIICTT307D |
Spray linings for existing pipeline systems |
RIICTT308D |
Install close-fit linings for existing pipeline systems |
RIICTT309D |
Install slip lining in existing pipeline systems |
RIICTT310D |
Renovate large diameter pipes and chambers |
RIIHAN201D |
Operate a forklift |
RIIHAN208D |
Perform dogging |
RIIHAN211D |
Conduct basic scaffolding operations |
RIIHAN301D |
Operate elevating work platform |
RIIHAN307D |
Operate a vehicle loading crane |
RIIHAN308D |
Load and unload plant |
RIIHAN309D |
Conduct telescopic materials handler operations |
RIIMPO318D |
Conduct civil construction skid steer loader operations |
RIIIMG301D |
Maintain site records |
RIIOGF302D |
Operate drilling fluids and mud pits |
RIIOGN303D |
Operate mud systems |
RIIWHS202D |
Enter and work in confined spaces |
RIIWHS204D |
Work safely at heights |
RIIWHS205D |
Control traffic with stop-slow bat |
RIIWHS302D |
Implement traffic management plan |
RIIRIS201D |
Conduct local risk control |
RIIRIS202D |
Respond to site based spills |
RIISAM205D |
Cut, weld and bend materials |
RIIWMG203D |
Drain and dewater civil construction site |
RIIWMG301D |
Control construction site water table |
TLID3011A |
Conduct specialised forklift operations |
UEGNSG202B |
Construct and lay distribution pipelines |
Group Q |
|
Unit code |
Unit title |
TLILIC2001A |
Licence to operate a forklift truck |
CPCCLDG3001A |
Licence to perform dogging |
CPCCLRG3001A |
Licence to perform rigging – basic level |
CPCCLSF2001A |
Licence to erect, alter and dismantle scaffolding – basic level |
Qualification Mapping Information
No equivalent qualification
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272