This unit covers the competency required to conduct a testing process. It includes managing the testing process, capturing data and adhering to the test plan. |
Application of the Unit
Application of the Unit |
This unit was developed for Defence test and evaluation workers but is applicable to individuals who work in this field. Typically these individuals must work independently or as part of a team under direct and indirect supervision, use discretion and judgement, and take responsibility for the quality of their output. All activities are carried out in accordance with relevant organisational policy and procedures. |
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
Employability Skills |
This unit contains employability skills. |
Pre-requisite Unit /s |
Nil |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a Unit of Competency. |
Performance Criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the Required Skills and Knowledge and/or the Range Statement. Assessment of performance is to be consistent with the Evidence Guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Initiate testing processes |
1.1 Stakeholders and test participants are briefed in accordance with organisational policy and procedures , and test plan 1.2 Safety systems and procedures are checked and initiated in accordance with organisational policy and procedures, and test plan 1.3 Test and evaluation activities are commenced in accordance with the approved test plan 1.4 Qualitative tests to observe relevant critical parameters are performed in accordance with organisational policy and procedures, and test plan 1.5 Quantitative tests to measure relevant critical parameters are performed in accordance with organisational policy and procedures, and test plan 1.6 Test data is collected and recorded in accordance with organisational procedures |
2. Monitor testing processes |
2.1 Test plans are monitored and amended based on changing circumstances in consultation with team members, and precise details are included for schedules of activities, milestones and resources 2.2 Required systems are monitored throughout the process in accordance with test plan 2.3 Risks are identified and the risk management process is applied in accordance with test plan 2.4 Management tools are applied throughout the process to achieve outcomes, in accordance with test plan 2.5 Data is compared with standards, charts and tables in order to meet compliance with required specification or test specific requirements 2.6 Initial analyses are checked in accordance with test plan procedures when non-standard results are obtained 2.7 Contingencies are recognised and managed in accordance with organisational policy and procedures |
3. Finalise testing processes |
3.1 Evaluation of testing process, equipment performance and achievement against objectives is undertaken and initial results are reported in accordance with organisational policy and procedures, and test plan 3.2 Security and confidentiality of data is maintained in accordance with workplace and regulatory requirements 3.3 Stakeholders and test participants are debriefed in accordance with organisational policy and procedures, and test plan 3.4 Test data is forwarded for analysis in accordance with organisational policy and procedures, and test plan 3.5 Management plans and any related contracts are reviewed and amended as appropriate in accordance with test plan 3.6 Review of objectives and achievement is conducted and outcomes are prepared for test report in accordance with organisational policy and procedures |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This describes the essential skills and knowledge and their level, required for this unit. |
Required Skills |
|
Required Knowledge |
|
Evidence Guide
EVIDENCE GUIDE |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
Consistency in performance Competency should be demonstrated over time and should be observed in a range of actual or simulated work contexts. |
Context of and specific resources for assessment |
Context of assessment Competency should be assessed in the workplace or in a simulated workplace environment. Specific resources for assessment Access is required to:
|
Guidance information for assessment |
In all cases, assessment should be supported by questions to assess required knowledge and those aspects of competency which are difficult to assess directly. Questioning techniques should suit the language and literacy levels of the candidate. Assessment methods should reflect workplace demands such as literacy and the needs of particular groups. Assessment methods suitable for valid and reliable assessment of this unit may include , but are not limited to , a combination of :
|
Range Statement
RANGE STATEMENT |
|
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. |
|
Stakeholders may include |
Clients or customers (internal and external) End user/s General public Industry Landowner/s Organisation's senior management Other agencies Other functional areas within the organisation Project teams Relevant interest groups Sponsor/funding bodies Steering committee members Supplier/service provider Unions |
Organisations may include |
Defence Defence contractors and sub-contractors Defence Materiel Organisation Defence Science and Technology Organisation International test agencies Universities |
Policy and procedures may include |
Relevant commonwealth, state/territory and local legislation affecting organisation's administration such as:
Government and organisational policy, guidelines and procedures relating to:
|
Test plans may include |
Acquisition strategies Budget and financial management strategy Contract management Cost estimates Evaluation criteria Expected/measurable outcomes Facilities Functional performance specifications Governance strategy Implementation strategy Inclusions and exclusions Information/communication strategy Intellectual property strategies Milestones Objectives Occupational concept document People plan including human resource management and human resource development Performance criteria/indicators Purpose Quality assurance Quality control Quality standards Rationale Required resources Resource management Risk management Roles and responsibilities Safety criteria Schedule/timeline Specific equipment, instrumentation, and/or specialised facilities and required conditions Task/WBS Test and evaluation master plan (TEMP) criteria Test Concept Document (TCD) Testing control mechanisms Testing deliverables and their acceptance criteria |
Safety systems may include |
Checklists Hazard analysis NOTAMS OH&S Physical constraints Risk analysis Systems safety management plans |
Required systems may include |
Data collection systems Financial management Planning and monitoring system Recordkeeping for documented information such as:
|
Risk management may include |
Acceptance Avoidance Minimisation Transfer |
Management tools may include |
Communications plan Life cycle cost analysis Logistics support analysis Organisational testing governance framework Recording systems - electronic and manual Reporting framework Risk analysis Spreadsheets Test and evaluation management software and other tools:
|
Data may include |
Audio Electronic (digital or analogue) recordings/logs Imagery including satellite Observations Physical components Physical evidence Qualitative statements Statistical results |