^

 
 

Unit of competency details

MSACMT220A - Apply quick changeover procedures (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to MSS402020A - Apply quick changeover procedures 01/May/2012

Releases:
ReleaseRelease date
1 1 (this release) 01/Sep/2008

Training packages that include this unit

CodeSort Table listing Training packages that include this unit by the Code columnTitleSort Table listing Training packages that include this unit by the Title columnRelease
PMB07 - Plastics, Rubber and Cablemaking Training PackagePlastics, Rubber and Cablemaking Training Package 1.1 
LMF02 - Furnishing Training PackageFurnishing Training Package 6.0-8.1 
PUA00 - Public Safety Training PackagePublic Safety Training Package 8.1 
MSA07 - Manufacturing Training PackageManufacturing Training Package 6.0-8.1 
FPP10 - Pulp & Paper Manufacturing Industry Training PackagePulp & Paper Manufacturing Industry Training Package 1.0-1.1 
AUM12 - Automotive ManufacturingAutomotive Manufacturing 1.0 
AUM08 - Automotive ManufacturingAutomotive Manufacturing 1.1 
UEE11 - Electrotechnology Training PackageElectrotechnology Training Package 1.0 
DEF12 - Defence Training PackageDefence Training Package 1.0,2.0 
LMT07 - Textiles, Clothing and Footwear Training PackageTextiles, Clothing and Footwear Training Package 3.1-4.0 

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
MSA61108 - Advanced Diploma of Competitive ManufacturingAdvanced Diploma of Competitive ManufacturingSuperseded1-2 
LMT20607 - Certificate II in Clothing Production (Intermediate)Certificate II in Clothing Production (Intermediate)Superseded
MSA20107 - Certificate II in Process ManufacturingCertificate II in Process ManufacturingSuperseded1-2 
LMT30507 - Certificate III in Clothing ProductionCertificate III in Clothing ProductionSuperseded
MSA30208 - Certificate III in Manufacturing TechnologyCertificate III in Manufacturing TechnologyCurrent1-2 
PMB30107 - Certificate III in Polymer ProcessingCertificate III in Polymer ProcessingSuperseded
FPP20210 - Certificate II in Papermaking OperationsCertificate II in Papermaking OperationsSuperseded
AUM40112 - Certificate IV in Automotive ManufacturingCertificate IV in Automotive ManufacturingSuperseded
FPP40110 - Certificate IV in Pulping OperationsCertificate IV in Pulping OperationsSuperseded
UEE30911 - Certificate III in Electronics and CommunicationsCertificate III in Electronics and CommunicationsSuperseded
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 55

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 080307 Organisation Management  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 080307 Organisation Management  07/Oct/2009 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

Unit descriptor 

This unit covers the knowledge and skills needed to do quick changeovers.

Application of the Unit

Application of the unit 

In a typical scenario, an organisation is pursuing quick changeover as one of its competitive manufacturing tools. This unit covers the carrying out of these quick changeovers and also recommending improvements within the scope and authority of the individual's job.

Particular technical skills may also be required in some manufacturing sectors and for some jobs. These will be contained in the relevant industry Training Package.

This unit requires the application of skills associated with applying quick changeover procedures including the planning and organising of own work, identifying problems and making suggestions for improvement of procedures.

Licensing/Regulatory Information

Not applicable.

Pre-Requisites

Prerequisite units 

Employability Skills Information

Employability skills 

This unit contains employability skills

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance Criteria describe the performance needed to demonstrate achievement of the Element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the Range Statement. Assessment of performance is to be consistent with the Evidence Guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Prepare for changeover

1.1. Determine when changeover will be required

1.2. Obtain all required tools/parts/materials for changeover

1.3. Organise process, and tools/parts/materials ready for changeover

1.4. Identify role of others in quick changeover

2. Make quick changeover

2.1. Plan changeover according to quick changeover principles

2.2. Liaise and work with relevant people in quick changeover

2.3. Complete changeover according to procedures 

2.4. Check output meets specification

2.5. Debrief with all relevant stakeholders

2.6. Note any steps which cause a problem

2.7. Recommend changes to problematic steps

3. Improve Occupational Health and Safety (OHS)

3.1. Identify hazards to self or others in all steps/actions

3.2. Determine risks from each hazard

3.3. Identify actions which may be performed in a more ergonomic manner

3.4. Recommend changes to improve OHS

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • ability to determine/predict when a changeover will occur
  • communication
  • teamwork
  • appropriate tools/process skills for set-up

Required knowledge 

  • principles of quick changeover
  • relevant procedures
  • purposes/requirements of changeover
  • methods of recommending changes
  • quality requirements for products
  • minimisation of changeover scrap

Evidence Guide

EVIDENCE GUIDE 

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.

Overview of assessment requirements 

The person will effectively and routinely carry out quick changeovers, in liaison with other relevant personnel, and will make recommendations for improving the changeover.

What are the specific resource requirements for this unit ?

Access to an organisation using quick changeovers.

What critical aspects of evidence are required to demonstrate competency in this unit ?

Evidence of routine positive participation in quick changeover.

In what context should assessment occur ?

Assessment will need to occur in an organisation using quick changeover or a suitable simulation, for example, in a workshop.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit ?

This unit may be assessed concurrently with relevant technical process units.

This unit is related to:

  • MSACMT620A Develop quick changeover procedures  which covers the manager/design area for quick changeover.

What method of assessment should apply ?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.

Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.

The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.

The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance ?

Evidence should be available of routinely participating in quick changeovers.

Range Statement

RANGE STATEMENT 

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

Changeover 

Changeover may refer to an exchange of dies/tools (traditional), or a change between batches, or between campaigns. It may be any quantum equipment/process change to produce a different product.

Changeover is sometimes referred to as SMED  which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set -up activity  in a minute or less of machine or process downtime; the key to doing this is frequently the capability to convert internal set -up time  to external set -up time ; variations on SMED include:

  • Single-digit set-up: performing a set-up activity in a single-digit number of minutes, i.e. fewer than ten.
  • OTED: One Touch Exchange of Die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set-up activity.

Set -up time  - work required to change over a machine or process from one item or operation to the next item or operation ; can be divided into two types:

  • internal set -up  work that can be done only when the machine or process is not actively engaged in production; OR
  • external set -up  work that can be done concurrently with the machine or process performing production duties.

While the term die is the traditional term, competitive manufacturers who require changeover, but where dies are not used or are less significant, have applied this to a range of other changeovers.

This unit may not be applicable to a totally continuous operation producing only the one product, or simultaneous range of products. This is not applicable to a maintenance/ PVI shutdown as experienced by the continuous process manufacturers. However, where there is continuous manufacturing on a campaign basis, it may be applied to the changeover between campaigns or similar changeovers.

Procedures 

Procedures include all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form.

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations.

Unit Sector(s)

Unit Sector 

CM Tools

Co-requisite units

Co-requisite units 

Functional area

Functional Area