Unit of competency
Modification History
Release 1.
Replaces superseded equivalent CPPSIS6036A Monitor complex engineering surveying structures.
This version first released with CPP Property Services Training Package Version 3.
Application
This unit of competency specifies the outcomes required to monitor engineering structures using surveying methods. The unit covers analysing project specifications and design information to identify components to be measured and monitored, and planning monitoring activities. The unit also covers implementing project management mechanisms, including risk management, and reviewing work outcomes against specifications. It covers setting up and using surveying equipment to measure, record and reduce surveying data using spatial coordinate and reference systems. The unit requires the ability to validate the accuracy of data, and identify and resolve discrepancies and non-conformities between specifications and activities.
The unit supports those who work in a technical management role in a surveying team.
No licensing, legislative, regulatory, or certification requirements apply to this unit of competency at the time of endorsement.
Pre-requisite Unit
Nil
Unit Sector
Surveying and spatial information services
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
||
1. |
Prepare to monitor engineering structure. |
1.1. |
Project specifications and engineering design information are interpreted to identify components to be measured, and accuracy and precision tolerances to be applied in consultation with appropriate persons . |
1.2. |
Characteristics of operating environment and any special equipment and resource requirements are identified according to project specifications and organisational requirements. |
||
1.3. |
Equipment to be used to collect data is selected and checked to ensure correct operation and functionality according to manufacturer specifications. |
||
1.4. |
Organisation of project resources, equipment, materials and transport is designated to appropriate persons. |
||
2. |
Develop project plan to monitor engineering structure. |
2.1. |
Project objectives, deliverables, constraints and principal work activities are documented according to project specifications. |
2.2. |
Information is included in project plan relating to identified risks and contingencies, resources, technologies and techniques to be used to collect spatial data. |
||
2.3. |
Validation processes to verify integrity of required spatial data are devised and specified in project plan. |
||
2.4. |
Work responsibilities are allocated and supervisory processes, checks and measures are implemented. |
||
3. |
Implement monitoring tasks. |
3.1. |
Project management mechanisms are implemented to schedule, measure, record and report progress of activities in relation to project plan. |
3.2. |
Risk management and contingency strategies are devised and followed to identify and control hazards and risks, and ensure that monitoring activities comply with legal and statutory requirements. |
||
3.3. |
Surveying equipment is used to measure identified spatial components according to project specifications. |
||
3.4. |
Measured spatial data is reduced to project spatial reference system for comparison with design. |
||
3.5. |
Measurements are validated, recorded and processed according to project specifications. |
||
3.6. |
Non-conformities between engineering structure and project specifications are identified and resolved, or contingencies are managed according to organisational requirements. |
||
4. |
Finalise and report monitoring results. |
4.1. |
Monitoring is finalised and results are checked for compliance with project specifications and organisational requirements. |
4.2. |
Appropriate persons are notified of monitoring results according to organisational requirements. |
||
4.3. |
Documentation is completed and spatial data archived according to project and organisational requirements. |
||
4.4. |
Monitoring results are reviewed against project specifications and findings are reported to appropriate persons according to organisational requirements. |
Foundation Skills
This section describes the language, literacy, numeracy and employment skills essential to performance in this unit but not explicit in the performance criteria. |
|
Skill |
Performance feature |
Planning and organising skills to: |
|
Numeracy skills to: |
|
Oral communication skills to: |
|
Reading skills to: |
|
Writing skills to: |
|
Technology skills to: |
|
Problem-solving skills to: |
|
Range of Conditions
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Appropriate persons must include at least two of the following: |
|
Unit Mapping Information
CPPSIS6036A Monitor complex engineering surveying structures
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=6f3f9672-30e8-4835-b348-205dfcf13d9b