Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to design gas bulk storage systems, determine relevant installation details and prepare system specifications for a range of residential, commercial and industrial buildings. |
Application of the Unit
Application of the unit |
This unit of competency supports the development of skills and knowledge required for competent workplace performance in a consultancy or supervisory capacity in relation to plumbing services and hydraulics. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
Nil |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Evaluate design parameters. |
1.1. Scope of work is established for gas bulk storage systems for a range of projects. 1.2. Design requirements are determined from plans, specifications and client briefs. 1.3. Cost -benefit analysis is conducted comparing a range of pipe materials and system designs. 1.4. Statutory and regulatory requirements and Australian and New Zealand standards for the design of gas bulk storage systems are analysed and applied. 1.5. Manufacturer requirements and trade and technical manuals are interpreted. 1.6. Additional research, including a desktop study , is conducted to outline design parameters. 1.7. Performance requirements are established. |
2. Plan and detail system components. |
2.1. Layout of a liquefied petroleum gas (LPG) bulk storage installation is determined in accordance with regulatory authorities. 2.2. Site plans for bulk installations are prepared, including layout of pipework systems . 2.3. Fire protection systems are specified in accordance with Australian and New Zealand standards and deluge systems are detailed. 2.4. Control valves and fittings are designed and detailed. 2.5. Content gauges are analysed and located in accordance with code requirements, and meters and regulators are specified. 2.6. Vaporisers are evaluated and specified and vaporisation rates are calculated. 2.7. System calculations are performed for a range of applications in accordance with regulations and manufacturer requirements. 2.8. Pipe fixings are designed for a range of applications. 2.9. Approved materials , jointing methods and installation requirements for gas bulk storage systems are specified. |
3. Design and size systems. |
3.1. Gas bulk storage systems and circuits are designed for a range of applications. 3.2. Deluge systems are designed. 3.3. Gas bulk storage systems are designed and sized using computer software packages. |
4. Prepare documentation. |
4.1. Plans are prepared for a range of gas bulk storage systems. 4.2. Specification for a gas bulk storage system is prepared. 4.3. Testing and commissioning schedule is prepared. 4.4. Operation and maintenance manual is produced. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Scope of work includes: |
|
Design requirements include: |
|
Cost -benefit analysis includes: |
|
Statutory and regulatory requirements and Australian and New Zealand standards include: |
|
Manufacturer requirements include: |
|
Desktop study includes collection and interpretation of existing data for design purposes from: |
|
Performance requirements include: |
|
Layout of pipework systems should: |
|
Control valves and fittings may include: |
|
Meters include: |
|
System calculations include: |
|
Pipe fixings include: |
|
Materials include: |
|
Jointing methods include: |
|
Installation requirements include: |
|
Plans include: |
|
Specification includes: |
|
Testing includes: |
|
Commissioning schedule includes: |
|
Operation and maintenance manual includes: |
|
Unit Sector(s)
Unit sector |
Plumbing and services |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |