Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to install and test ducting systems used for ventilation systems, heating and/or cooling systems, and exhaust systems. |
Application of the Unit
Application of the unit |
Site location for work application may be either domestic or commercial and may be a new work site or an existing structure being renovated, extended, restored or maintained. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
CPCPCM2023A |
Carry out OHS requirements |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Prepare for work. |
1.1. Plans and specifications are obtained. 1.2. Safety (OHS ) requirements associated with installing and testing ducting systems, and workplace environmental requirements , are adhered to throughout the work. 1.3. Quality assurance requirements are identified and adhered to in accordance with workplace requirements. 1.4. Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. 1.5. Tools and equipment , including personal protective equipment, are selected and checked for serviceability. 1.6. Work area is prepared to support efficient installation and testing of ducting systems. |
2. Identify system requirements. |
2.1. Quantity and type of ducting system materials , including in-duct equipment, are calculated from plans, specifications and relevant information . 2.2. Allowances for fabrication or assembly are determined and transferred. 2.3. Materials are identified, ordered and collected in accordance with workplace procedures. 2.4. Materials and equipment are checked for compliance with standards, docket and order form, and acceptable condition and faults are reported . |
3. Install and insulate duct system. |
3.1. System is set out to comply with plans and specifications. 3.2. Duct supports and fixings are positioned to comply with plans, specifications and manufacturer recommendations. 3.3. Duct work is installed in accordance with plans and specifications. 3.4. Circumferential joints are assembled and sealed in accordance with plans, specifications and manufacturer recommendations. 3.5. Duct system is installed in specified location, without damage or distortion to surrounding environment or other services and in accordance with standards. 3.6. Insulation materials are fixed in accordance with plans and specifications. 3.7. Insulation materials are installed in specified location without damage to surrounding environment and in accordance with plans, specifications, standards and manufacturer recommendations. 3.8. Diffusers and terminal devices are installed in accordance with plans and specifications and with no damage to ceiling or finished surfaces. |
4. Test duct work system. |
4.1. Test requirements are determined from plans and specifications. 4.2. Appropriate test equipment is selected for specified tests. 4.3. Duct system is tested under pressure in accordance with instructions and workplace procedures. 4.4. Leak sources are identified and repaired using specified procedures and materials, to ensure correct flow operation. 4.5. Details of test data are recorded in format required by the specification. |
5. Clean up. |
5.1. Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. 5.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. 5.3. Documentation is completed in accordance with workplace requirements. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Safety (OHS ) is to be in accordance with commonwealth, state and territory legislation and regulations and may include: |
|
Environmental requirements are to cover: |
|
Quality assurance requirements may include: |
|
Statutory and regulatory authorities include: |
|
Tools and equipment may include: |
|
Ducting system materials : |
|
Information may include: |
|
Materials : |
|
Fault reporting : |
|
Diffusers and terminal devices include: |
|
Unit Sector(s)
Unit sector |
Plumbing and services |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |