Unit descriptor |
This unit of competency specifies the outcomes required to restore, repair and prepare different material surfaces for the application of paint. The unit includes planning and preparation for the work, preparation of new or uncoated surfaces, preparation of previously coated surfaces, preparation of previously wallpapered surfaces for painting and completion of clean-up activities. |
Application of the Unit
Application of the unit |
This unit of competency supports the attainment of the understanding and skills to prepare surfaces for painting, which may include working with others and as a member of a team. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare. |
1.1. Work instructions and operational details are obtained using relevant information , confirmed and applied for planning and preparation purposes. 1.2. Safety (OHS ) requirements are followed in accordance with safety plans and policies. 1.3. Signage and barricade requirements are identified and implemented. 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements . 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. 1.8. Finishes to be applied to all surfaces are identified in accordance with job requirements, and application that complies with manufacturer specifications. |
2. Prepare new or uncoated surfaces for painting or clear finish. |
2.1. Suitability of surface for painting or clear finish application is determined in accordance with manufacturer recommendations and job specifications. 2.2. Surface preparation method is correctly selected in accordance with the environment, finish and substrate requirements. 2.3. Surface is prepared to manufacturer specifications in compliance with substrate requirements, specifications and relevant standards. 2.4. Surface imperfections are stopped, filled and sanded to a smooth finish ready for painting in accordance with manufacturer recommendations and job specifications. |
3. Prepare previously coated surfaces for painting or clear finish. |
3.1. Condition and nature of existing substrate and surface material are determined and tested in accordance with relevant standards. 3.2. Potential hazards are identified and correct procedures are used to reduce risks in accordance with manufacturer recommendations and job specifications. 3.3. Surface preparation method is correctly selected in accordance with the environment, finish and substrate requirements. 3.4. Surfaces are prepared by removing unwanted coatings and loose debris. 3.5. Surface defects are repaired and imperfections stopped, filled and sanded to smooth finish ready for painting in accordance with manufacturer recommendations and job specifications. |
4. Remove wallpaper and prepare surface for painting. |
4.1. Type, condition and nature of existing type of wallpaper are determined prior to removal. 4.2. Surface preparation method is correctly selected in accordance with the environment, finish and substrate requirements. 4.3. Wallpaper is removed using the most appropriate method. 4.4. Surfaces are prepared for paint application by removing loose debris. 4.5. Surface defects are repaired and imperfections stopped, filled and sanded to smooth finish ready for painting in accordance with manufacturer recommendations and job specifications. |
5. Clean up. |
5.1. Waste and unwanted materials are removed and placed into job waste bins or rubbish stockpile in accordance with sound work practices and compliance with environmental requirements. 5.2. Painting tools and equipment are cleaned with correct solutions and without damage, and are stored safely and effectively to manufacturer specifications. 5.3. Unused materials are sealed and stored/stacked in accordance with standard material handling practices and techniques and company requirements. 5.4. Work area is cleared and materials disposed of or recycled in a manner to avoid spontaneous combustion in accordance with legislation, regulations, codes of practice and job specification. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Information includes: |
|
Planning and preparation include: |
|
Safety (OHS ) is to be in accordance with state and territory legislation and regulations and project safety plan and may include: |
|
Tools and equipment include: |
|
Quality requirements include: |
|
Environmental requirements include: |
|
Surface includes: |
|
Existing substrate and surface may be contaminated with: |
|
Tested includes: |
|
Surface preparation method includes: |
|
Wallpaper removal methods include: |
|
Unit Sector(s)
Unit sector |
Construction |
Functional area
Functional area |