Modification History
New unit.
This version first released with CPC08 Construction, Plumbing and Services Training Package Version 9.
Unit Descriptor
This unit of competency specifies the outcomes required to select and use hand tools and equipment safely and effectively to complete individual demolition tasks.
Application of the Unit
This unit of competency supports demolition workers who perform demolition tasks, such as removing fixtures and fittings, ceilings, walls, floors and floor support systems of all types of buildings using hand tools and equipment.
Licensing/Regulatory Information
Licensing, legislative, regulatory or certification requirements apply to demolition work in different States and Territories. Candidates are advised to consult with the relevant regulatory authorities.
Pre-Requisites
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge and/or the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 |
Plan and prepare. |
1.1 |
Work instructions are obtained using relevant information , confirmed with colleagues or supervisor, and applied to planning and preparation. |
1.2 |
Work health and safety (WHS) requirements are identified and applied to task planning according to safety plans and policies and work site requirements. |
||
1.3 |
Environmental requirements are identified and applied according to environmental plans and regulatory obligations. |
2 |
Identify and check tools and equipment. |
2.1 |
Hand tools and equipment to be used in the demolition process are identified and checked for serviceability, and faults are rectified and reported. |
2.2 |
Functions and methods of operation of demolition tools and equipment are identified from specifications, standards and manufacturer instructions. |
||
2.3 |
Specific WHS requirements for the selected tools and equipment are identified and applied. |
3 |
Complete demolition tasks. |
3.1 |
Work site inspection is conducted and hazards associated with individual demolition tasks are assessed immediately prior to commencing work according to workplace procedures. |
3.2 |
Safe demolition work method is amended if required and confirmed with colleagues or supervisor. |
||
3.3 |
Work area is prepared for the use of demolition tools and equipment. |
||
3.4 |
Tools and equipment that meet the requirements of the demolition task are selected. |
||
3.5 |
Pre-operational checks are completed according to manufacturer recommendations. |
||
3.6 |
Tools and equipment are used for their intended purpose in demolition tasks according to regulations, standards, codes of practice and workplace requirements. |
||
3.7 |
Work progress and hazards or issues arising during work tasks are communicated with work team according to workplace requirements. |
||
3.8 |
Tools and equipment are placed in safe locations when not in immediate use. |
4 |
Clean up. |
4.1 |
Work area is cleared and materials are sorted for reuse or recycling and removed, and waste is disposed of using safe manual handling techniques and according to workplace procedures, regulations, codes of practice, and job specifications |
4.2 |
Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices. |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace by observation of the selection and use of hand tools and equipment and completion of on-site demolition tasks as part of a team. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person should demonstrate the ability to:
|
Context of and specific resources for assessment |
Assessment of this unit:
Resource implications for assessment include:
|
Method of assessment |
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
|
Guidance information for assessment |
This unit could be assessed on its own or in combination with other units relevant to the job function. Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Information may include: |
|
Work health and safety requirements must comply with state or territory legislation and regulations and demolition project safety plan and may include: |
|
Environmental requirements may include: |
|
Hand tools and equipment may include: |
|
Hazards associated with individual demolition tasks may include: |
|
Demolition tasks : |
|
Pre-operational checks may include: |
|
Communication with work team may include: |
|
Unit Sector(s)
Demolition
Custom Content Section
Not applicable.