Unit Descriptor
This unit of competency specifies the outcomes required to slump test concrete to ensure the mix is workable and complies with the delivery docket and specified order.
The unit includes sampling and slump testing to a set range or tolerance. It may also include working with others and as a member of a team.
Application of the Unit
This unit of competency supports the role of those who slump test concrete designated for use on residential, commercial or civil construction sites. The results of slump tests are used to confirm the appropriateness of the concrete for the concrete work planned.
Licensing/Regulatory Information
Licensing, legislative, regulatory or certification requirements apply to concreting work in different states and territories. Candidates are advised to consult with the relevant regulatory authorities.
Pre-Requisites
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge and/or the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 |
Plan and prepare. |
1.1 |
Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes. |
1.2 |
Tools and equipment consistent with the job are selected, checked for serviceability, and faults are rectified and reported before work begins. |
||
1.3 |
Material quantity requirements are identified, calculated and confirmed according to plans, specifications and quality requirements . |
||
1.4 |
Environmental requirements are identified for the project according to environmental plans and regulatory obligations. |
||
1.5 |
Standard slumping cone is cleaned in preparation for slump testing. |
2 |
Test concrete slump measurement. |
2.1 |
Sample of concrete is taken, using the correct sampling procedure, directly from the delivery truck’s initial discharge. |
2.2 |
Slumping cone is filled and compacted according to standard slump testing procedures. |
||
2.3 |
Slumping cone is levelled off and surplus concrete is cleared from steel plate and slumping cone. |
||
2.4 |
Slumping cone is raised without moving the sample. |
||
2.5 |
Sample is measured for conformity with tolerance levels and resampling is conducted if sample is outside tolerance. |
||
2.6 |
Collapsed or sheared samples are recorded. |
3 |
Clean up. |
3.1 |
Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification. |
3.2 |
Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices. |
||
3.3 |
Work completion procedures are applied and relevant personnel notified that work is finished. |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed by observation in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person should demonstrate the ability to:
|
Context of and specific resources for assessment |
Assessment of this unit:
Resource implications for assessment include:
|
Method of assessment |
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
|
Guidance information for assessment |
This unit could be assessed on its own or in combination with other units relevant to the job function. Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include: |
|
Information may include: |
|
Planning and preparation must include: |
|
Tools and equipment : |
|
Quality requirements must include: |
|
Environmental requirements may include: |
|
Sampling : |
|
Slump testing must include: |
|