Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to conduct a slump test to concrete to ensure the mix is workable and complies with the delivery docket and specified order. The unit includes sampling and slump testing to a set range or tolerance. |
Application of the Unit
Application of the unit |
This unit of competency supports the attainment of the understanding and skills to conduct a slump test to concrete, which may include working with others and as a member of a team. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
|||
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
||
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare. |
1.1. Work instructions and operational details are obtained using relevant information , confirmed and applied for planning and preparation purposes. 1.2. Safety (OHS ) requirements are followed in accordance with safety plans and policies. 1.3. Signage and barricade requirements are identified and implemented. 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements . 1.6. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. |
2. Slump test concrete. |
2.1. Standard slumping cone is cleaned in preparation for slump testing . 2.2. Sample of concrete, using the correct sampling procedure, is taken directly from the delivery truck's initial discharge. 2.3. Slumping cone is placed on a steel tray and cone is filled to one third of its capacity. 2.4. Concrete is compacted by rodding 25 times in an even pattern with a steel rod. 2.5. Slumping cone is filled to two thirds its capacity and rodding 25 times is applied to penetrate the previous layer. 2.6. Slumping cone is filled to overflowing and rodding 25 times is applied to penetrate the previous layer. 2.7. Slumping cone is levelled off with the steel rod and surplus concrete is cleared from steel plate and slumping cone. 2.8. Slumping cone is raised without moving the sample. 2.9. Sample is measured against height of the slumping cone for conformity. 2.10. Collapsed or sheared samples are recorded. |
3. Clean up. |
3.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 3.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 3.3. Work completion procedures are applied and relevant personnel notified that work is finished. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Information includes: |
|
Planning and preparation include: |
|
Safety (OHS ) is to be in accordance with state and territory legislation and regulations and project safety plan and may include: |
|
Tools and equipment : |
|
Quality requirements include: |
|
Environmental requirements include: |
|
Slump testing : |
|
Sampling : |
|
Rodding includes: |
|
Measuring includes: |
|
Unit Sector(s)
Unit sector |
Construction |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |