Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to plan, prepare, set out, construct and erect ceiling frames to accommodate ceiling joists, hanging beams, strutting beams and composite beams. It includes selection of members and setting out of the ceiling frame in conjunction with the roof members. |
Application of the Unit
Application of the unit |
This unit of competency supports achievement of skills to determine materials and process, and then construct a range of ceiling frames used in the construction industry, which includes working with others and as a member of a team. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry |
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare. |
1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained for planning the work and confirmed and applied from relevant information . 1.2. Safety (OHS ) requirements are followed in accordance with safety plans and policies. 1.3. Signage and barricade requirements are identified and implemented. 1.4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. 1.5. Material quantity and quality requirements are calculated in accordance with plans and specifications. 1.6. Materials appropriate to construction of ceiling frames , including fire resistance ratings are identified, obtained, prepared, safely handled and located ready for use. 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. 1.8. Passive and active fire control elements for ceiling frame construction and installation are identified and applied. |
2. Locate ceiling joists. |
2.1. Ceiling frame components are identified and selected in accordance with regulatory criteria. 2.2. Location of ceiling joists are set out on the top plate to specifications for spacings of roof and ceiling members. 2.3. Ceiling joists and trimmers are cut to length, placed and securely fixed to locations in accordance with specifications. |
3. Install hanging beams. |
3.1. Hanging beam sizes and spacings are checked in accordance with regulatory criteria. 3.2. Hanging beams are installed. 3.3. Hanging beams on external walls are placed alongside rafter locations where specified. 3.4. Ceiling joists are connected using appropriate connecting methods to hanging beams. |
4. Clean up. |
4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Planning includes: |
|
Information includes: |
|
Safety (OHS ) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include: |
|
Tools and equipment include: |
|
Quality requirements include relevant regulations, including: |
|
Materials include: |
|
Construction of ceiling frames : |
|
Environmental requirements include: |
|
Statutory and regulatory authorities include: |
|
Ceiling frame components include: |
|
Hanging beams include: |
|
Connecting methods include: |
|
Unit Sector(s)
Unit sector |
Construction |
Co-requisite units
Co-requisite units |
Nil |
Functional area
Functional area |