Modification History
Not applicable.
Unit Descriptor
Unit descriptor |
This unit describes the performance outcomes, skills and knowledge required to contribute to the control of a project's scope by assisting with the identification of objectives, deliverables, constraints, assumptions and outcomes; and by applying controls once the project has commenced. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement. |
Application of the Unit
Application of the unit |
This unit applies to a project team member working under the direction of a project manager with other project team members. The individual may be operating within an organisation or as a consultant. The skills should be applied in the context of multiple complex projects, with the individual operating as part of a specialist project management team. In the context of this unit a complex project is defined as a project which involves:
The functions performed by a worker managing a straightforward project or a section of a larger project where project management is not the main focus of the job role are covered by BSBPMG510A Manage projects. The functions performed by a project manager to manage the scope of the whole project are addressed in BSBPMG502A Manage project scope. |
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Prerequisite units |
||
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Contribute to scope definition |
1.1. Contribute to the identification of project deliverables 1.2. Contribute to the identification of measurable outcomes to enable evaluation of project performance 1.3. Contribute to the development of the scope management plan |
2. Apply project scope controls |
2.1. Undertake work in accordance with agreed project management plan and by using established change control procedures and performance measurement procedures 2.2. Monitor and control aspects of project scope and communicate instances of non-compliance with overall scope to the project manager and other team members 2.3. Measure progress to determine potential, perceived and actual scope changes 2.4. Appropriately report scope changes 2.5. Provide assistance in the review of project outcomes to determine the effectiveness of initial and subsequent scope management approaches |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
EVIDENCE GUIDE |
|
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
Evidence of the following is essential:
|
Context of and specific resources for assessment |
Assessment must ensure:
|
Method of assessment |
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
|
Guidance information for assessment |
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
|
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Project deliverables may include: |
|
Scope management plan may include: |
|
Change control procedures may include: |
|
Performance measurement procedures may include: |
|
Unit Sector(s)
Unit sector |
Competency field
Competency field |
Management and Leadership - Project Management |
Co-requisite units
Co-requisite units |
||