Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit covers managing a tree transplanting program and defines the standard required to: assess the transplant trees; assess the lifting and transplant sites; determine the transplant and transportation requirements and removal method; implement the transplanting operation; document the tree transplanting program, budget and monitoring procedures; document the contingency planning and after-care plan. |
Application of the Unit
Application of the unit |
This unit applies to the management a tree transplanting program and is likely to be undertaken without supervision, with only general guidance on progress sought by management and/or the client. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Not Applicable
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Assess the sites and trees |
1.1. Site assessments are undertaken to identify site conditions which may impact upon transplanting activities at the lifting site and the transplant site. 1.2. Occupational Health and Safety (OHS) hazards are identified, risks assessed and suitable controls recommended. 1.3. Liaison with local authorities and information services is undertaken to determine location of services and utilities, and legislation, local by-laws and regulations governing the transplanting/transporting of trees. 1.4. Trees are assessed for viability for transplanting to ensure the best time and conditions are chosen according to tree species characteristics. |
2. Determine transplanting requirements |
2.1. The appropriate tools, equipment, machinery and specialist contractors are identified in accordance with the site assessment and tree species to be transplanted. 2.2. Excavation methods and root ball preparation is determined according to the characteristics of the species. 2.3. Crown reduction/protection tasks are determined according to the characteristics of the species and are planned to meet AS4373 Pruning of amenity trees. 2.4. Root ball and tree mass is calculated to determine appropriate lifting and transport requirements. 2.5. Personnel/contractor requirements are negotiated to ensure trees are prepared, lifted, transported and re-installed with minimum stress to the trees, and with regard to safety and environmental factors. 2.6. A transport route is identified with regard to the size and shape of the tree and road transport vehicle requirements. 2.7. An aftercare plan outlining monitoring frequency and methods to maintain the health and viability of the transplanted tree(s) is determined and documented in the program. |
3. Document a tree transplanting program |
3.1. Transplanting program is documented according to management and/or client needs. 3.2. Resources and costing details are documented and presented to management and/or the client. 3.3. Transplanting program is communicated to the relevant personnel for implementation. 3.4. Transplant operations are performed as per standard Implement a tree transplanting program. 3.5. Completed tree transplanting program is assessed to ensure that transplantation was undertaken according to the identified program and budget guidelines. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
|
Context of and specific resources for assessment |
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. |
|
Transplanting program may include: |
|
Unit Sector(s)
Unit sector |
Landscape |
Co-requisite units
Co-requisite units |
||
Competency field
Competency field |